AI Engineering Sprints · capacity: sized to your backlog

Hire the harness, not just the hands.

Senior engineers who already build inside the harness method, dropped straight into a backlog we didn't write, sized to what you need this month, not a fixed team from day one.

Resized every month, not fixed at kickoff.

Models we harness
  • Claude
  • GPT
  • Gemini
  • Llama
  • Mistral
  • Qwen
  • DeepSeek
  • Your fine-tuned LoRA
Domains we already engineer in
  • Blockchain / DeFi
  • Fintech & regulated finance
  • Data quality & pipelines
  • Developer tooling
  • E-commerce & logistics
  • Internal platforms
The problem

A contractor gives you hands. Rarely the method.

Most staff-augmentation engagements hand you a résumé and a board invite. The engineer learns your stack from zero, ships the way any contractor would, and the context leaves when they do.

A generic contractor

Ramp-up on your stackweeks
Spec, then codewritten after, if ever
Test for the fixwhatever there was time for
Domain fluencylearned on your clock
When they leavethe context leaves too

An AI Engineering Sprint

Ramp-updays
Spec, then codeSDD: every item starts as one
Test for the fixTDD: fails if it regresses
Domain fluencyalready there
When we wind downthe skills and runbook stay
The solution

One engineer today. Whoever the backlog needs next.

We staff your backlog directly, not a fixed team. Start with one senior engineer fluent in the harness method; add a specialist (front-end, on-chain, data) only when the backlog actually calls for it; wind down to on-demand maintenance once it stabilizes.

Included

Dynamic team · sized month to month

  • Senior AI-native engineers embedded directly in your backlog, sprint by sprint
  • Spec-driven + test-driven (SDD + TDD): every item ships from a written spec and a test that fails if the logic regresses
  • Recurring procedures documented as reusable skills, for your team and for the AI, not tribal knowledge
  • Scrum cadence: weekly sprints, a groomed and prioritized backlog you can see
  • Dynamic team: starts with one role, adds a specialist only when the backlog justifies it
  • Documentation and a runbook, so your team can run it without us
  • Winds down to an on-demand maintenance floor, not an all-or-nothing contract

Not included

  • A brand-new system with no existing backlog (that's AI Systems)
  • Company-wide governance and audit design (that's AI Enterprise)
  • Tool and infrastructure costs (billed to you directly)
Examples

What sizing actually looks like.

Four moments in a typical engagement, not a sample backlog.

Backlog sizing

Start with the smallest team that ships

We read the backlog before proposing headcount. Most engagements start with exactly one senior engineer, not a pod handed to you by default.

Illustrative scope

Spec, then code

Every fix starts as a spec and a test

Spec-driven, then test-driven: the test fails on the bug before the fix exists, and passes after. A recurring procedure, like investigating a data spike or closing the month, gets saved as a skill instead of living in one engineer's head.

Illustrative scope

Specialist add-on

Scale up only when the backlog says so

A front-end, design, or on-chain specialist joins when the backlog actually has that kind of work, not on day one because the org chart says so.

Illustrative scope

Domain fluency

No ramp-up on the domain, just the codebase

Engineers already fluent in the domain (blockchain, fintech, regulated data) spend the ramp-up on your codebase, not on the subject matter underneath it.

Illustrative scope

Wind-down

Maintenance, not a cliff

When the backlog stops growing, the engagement doesn't end abruptly. It steps down to a documented maintenance floor, hours as needed.

Illustrative scope

stepmodel callhuman in the loopcheck / gate
How it works

Sized every month, not fixed at kickoff.

01

Week 1

Read the backlog

What's real versus nice-to-have, where the risk actually sits, and the smallest team that can ship it, not the team that's easiest to sell.

02

Week 2

Ship the first sprint

One AI-native engineer, spec-driven and test-driven from commit one, in a weekly Scrum cadence you can see.

03

Ongoing

Scale with demand

A specialist joins only when the backlog calls for it. Recurring procedures get saved as skills along the way. Cadence stays weekly either way.

04

When it stabilizes

Wind down, don't cut off

Steps down to an on-demand maintenance floor, documented and handed off, not a cliff.

Talk to us

What's sitting in your backlog right now?

Tell us the backlog and what's blocking it. We reply within two business days with how we'd size the team.

  • No fixed team: sized to the backlog, month to month.
  • No public pricing: scope is priced to the work.
  • No cliff: winds down to maintenance, not to zero.
We don't share your details. No newsletter.
FAQ

What people ask before they write to us.

How is this different from AI Systems?

AI Systems is for a system we build from scratch, and optionally keep shipping backlog for afterward. Engineering Sprints is for a backlog and a codebase that already exist, that we didn't build, staffed as standing capacity from day one, not after a build.

Isn't this just staff augmentation?

The headcount looks similar. What's different is what the engineer brings on day one: AI-native engineering (Claude Code as the default way of building, not an occasional tool), spec-driven + test-driven delivery, and domain fluency instead of a learning curve you pay for.

What does "spec-driven, test-driven" mean in practice?

Every backlog item starts as a short written spec (what changes and why) before any code. Then a test is written that fails on the current bug and passes once it's fixed. A data-quality fix doesn't come back silently because nobody remembered to check for it by hand.

How are sprints run?

Scrum, weekly: a groomed and prioritized backlog, a sprint goal, and a review you can see. Recurring procedures, like closing the month or investigating a data spike, get written up as reusable skills instead of staying in one engineer's head.

How is pricing structured?

We don't publish pricing: every engagement starts with a short paid assessment of the backlog, then a retainer sized to the team that backlog needs that month, stepping down to a maintenance floor once it stabilizes. Tell us the backlog and you get a real number, not a rate card.

Can we start with just one engineer?

That's the default starting point, not the exception. Most engagements begin with one senior engineer against the highest-priority backlog item and grow only when the work in front of us justifies it.

What happens when the backlog slows down?

It steps down to an on-demand maintenance floor instead of ending the relationship outright: documented, handed off, and billed only for hours actually used.